Repository navigation
ci: pin report-lane-outcome at c41e345 for the max-turns sizing stop - #11964
Conversation
Makes ci-workflows#946's max-turns sizing-stop message live. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Codex Review SummaryThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
|
claude-security-review needs no new review of Security review: PR #11964, report-lane-outcome repinned to c41e345No security issues found. I read every hunk in all 7 changed files. What changed
Trust-control checks
Limits of this review: I could not read the action's contents at Spend: none. The change adds no lane runs, turns or billed resources. critical-findings: 0 |
|
claude-review needs no new review of Code review: PR #11964, pin report-lane-outcome at c41e345No findings. I read every hunk in all 7 changed files: one test file and six workflows, all on trusted paths. What changes
Checks I ran with the tools I have (I had no shell, so I did not run any tests)
Claims I could not check: the Closing issue: none. The PR only references #7901 and closes no issue, so there are no acceptance criteria to check. Spend: this only changes which version of a reporting action the existing lane runs use. It adds no runs and no billed resources, so there is no cost hold. |
|
The pr-verify verifier failed head What it wrote (26 lines)This pull request leaves the merge queue, and ci-status holds it out while it carries |
Refs: #7901
Summary
ci-workflows#946 (merged as c41e345) gives
class=max-turnsits own sizing-stop message inreport-lane-outcome, in place of the infrastructure-error text. This repository pinned that action at 2476d5d (2026-10-29), so the new message never ran here. This is #7901's ci-workflows fix item 1, made live.Fix
report-lane-outcome@pins in six workflows move toc41e3457e01c9ff6ca2c3d10e5bf470551383e11 # c41e345 2026-11-01. The action has no later change on ci-workflows main.pr-verify/workflow.test.mjs's one-commit pin test now requires one SHA for every other ci-workflows action, and one for report-lane-outcome.Verification
node --test: resolve-config/callers.test.mjs 218 pass; pr-review-main/workflow.test.mjs 39 pass; pr-verify/workflow.test.mjs 31 pass (it failed before the test update); report-check-run/lane-record.test.mjs 7 pass.Pin choice
c41e345 is the ci-workflows main commit that merged #946. No ci-workflows tag contains it yet:
git tag --contains c41e345is empty, and the newest tag is v0.67.2. The pins it replaces, 2476d5d, are also an untagged main commit after v0.67.2. So pinningreport-lane-outcometo a main commit follows this repository's existing ci-workflows pin practice. All 57report-lane-outcomepins in the repository move: a grep of the head finds none left at 2476d5d.Remaining
#7901 stays open for its item 4: find out, from the Claude Code CLI or SDK source, what
num_turnscounts against--max-turns, which explains a run reporting 140 turns under--max-turns 75. The issue's 2026-11-01 host-run comment says that answer is still owed. This PR delivers ci-workflows item 1 together with ci-workflows#946.Related
🤖 Generated with Claude Code