Skip to content

chore: record the command-split sign-off, the question-gate fixes and new drafts - #887

Merged
REPPL merged 15 commits into
mainfrom
chore/captures-2026-10-09e
Oct 10, 2026
Merged

REPPL merged 15 commits into
mainfrom
chore/captures-2026-10-09e

Conversation

@REPPL

@REPPL REPPL commented Oct 10, 2026 •

Copy link
Copy Markdown
Collaborator

Records from the 2026-10-09 and 2026-10-10 interviews with the product thinker. No code changes.

  • Command split (itd-2610090831227812): the remaining command placements; the hiding ruling, after a live trial in which a hidden page was off the person's menu, refused when typed and still run by an agent; the confirmed press release, criteria and merges; then the sign-off, which plans the intent (breaking) with its spec minted and its design still to write.
  • Library and memory: the memory-notes draft and its decision record, and the brief's side-by-side explanation with two glossary entries.
  • Question gate: three fixes filed (the mode taken from the question's chip, the rows line in a refusal, the record filename cut at 40 characters with the longer names renamed), plus the general rewriter draft (itd-2610100627454580) with its rulings.
  • Sub-agent budget: a draft for a model-weighted per-run budget (itd-2610100704270254).
  • Inbox: six managed-repository reports promoted.
  • Reading windows: recalibrated at this tip, because the brief grew past the entailment window (450,548 of 450,000 tokens).
  • Flakes: two captures, the id collision that dropped an earlier records PR and a site test that fails under machine load.

Refs: iss-2610100626211810, iss-2610100626327722, iss-2610100626320367, iss-2610100649466578, iss-2610100649471088, iss-2610100649479892, iss-2610100649485756, iss-2610100649481907, iss-2610100649495706, iss-2610100846469473

Assisted-by: Claude:claude-opus-5-5

REPPL added 15 commits October 10, 2026 09:30
…t rule

A draft intent in which agents keep memory notes through /abcd:memory,
recalled by the rules loader and kept on the person's machine until
promoted into the record; a proposed decision record on what may enter a
note without the person's yes; and the issue that abcd report must ask
the person's permission before filing from a managed repository.

Refs: iss-2610091903077581
Refs: itd-2610091918433290, itd-3, itd-39, adr-2610091918443997
Assisted-by: Claude:claude-opus-5-5
A plain comparison in the surfaces overview and two glossary entries
(library, memory note); the memory draft gains the criterion that the
user-facing docs carry the same comparison when it ships.

Refs: itd-2610091918433290, itd-2610090831227812
Assisted-by: Claude:claude-opus-5-5
Refs: iss-2610092011131598
Assisted-by: Claude:claude-opus-5-5
…search

The product thinker's placements of report, spec, rules, version,
prepare-this-repo, changelog and the library merge are entered in the
verb-split draft, with the criterion that the docs explain the library
and memory notes side by side; the state-of-the-art note on how tools
divide commands for people and agents is filed for the verb audit.

Refs: iss-2610091903077581, iss-2610090831317531
Refs: itd-2610090831227812, itd-2610091918433290
Assisted-by: Claude:claude-opus-5-5
The product thinker chose the host's hiding over a grouped prefix after a
live trial: a hidden page leaves the person's menu, is refused when typed,
and still runs when an agent is asked. The open question on the mechanism
is closed and the full-name criterion states the host's refusal.

Assisted-by: Claude:claude-opus-5-5
The opening paragraph now states the hiding, the host's answer to a hidden
name typed in full, and the same list in the terminal help; the quote and
its product-thinker persona stay as drafted.

Assisted-by: Claude:claude-opus-5-5
The product thinker accepted the person-visible and technical criteria and
put the merges and the version retirement in this intent; five criteria
for them are added and the scope narrows to match.

Assisted-by: Claude:claude-opus-5-5
The product thinker confirmed every section and signed off; the intent is
planned with breaking impact and its spec is minted, its design record
still to write.

Assisted-by: Claude:claude-opus-5-5
The product thinker's rewriter proposal was reviewed adversarially and
split: three code fixes come first (the mode taken from the question's
chip, the rows line in a refusal, the record filename cap), then a draft
that grows the question drafter into a rewriter for any reader and limit.

Refs: iss-2610100626211810, iss-2610100626327722, iss-2610100626320367
Assisted-by: Claude:claude-opus-5-5
The product thinker promoted every waiting report into the ledger and
ruled that every record slug is cut at 40 characters, renaming the
longer existing record files in one change.

Refs: iss-2610100626320367, iss-2610100649466578, iss-2610100649471088, iss-2610100649479892, iss-2610100649485756, iss-2610100649481907, iss-2610100649495706
Assisted-by: Claude:claude-opus-5-5
Assisted-by: Claude:claude-opus-5-5
Measured on 3642252 (the records branch rebased onto v0.13.4) with
`reading assemble --dry-run`: widening 1,528,764 tokens (window 1,530,000
-> 1,550,000), entailment 450,548 (450,000 -> 460,000), detection 1,537,800
(1,540,000 -> 1,560,000); each is the smallest ten-thousand boundary with
one per cent headroom. The brief's library and memory section, its two
glossary entries and the records filed since the last calibration grew
what the positions read.

Assisted-by: Claude:claude-opus-5-5
Refs: iss-2610100846469473
Assisted-by: Claude:claude-opus-5-5
@REPPL
REPPL enabled auto-merge October 10, 2026 09:00
@REPPL
REPPL added this pull request to the merge queue Oct 10, 2026
Merged via the queue into main with commit 6fcd898 Oct 10, 2026
13 of 16 checks passed
@REPPL
REPPL deleted the chore/captures-2026-10-09e branch October 10, 2026 10:19
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant