Skip to content

build(itd-2609201925079472): the whole spec, step 1 of spc-2609301921521360 - #882

Closed
REPPL wants to merge 2 commits into
mainfrom
build/run-2610092052125685-lane-1
Closed

REPPL wants to merge 2 commits into
mainfrom
build/run-2610092052125685-lane-1

Conversation

@REPPL

@REPPL REPPL commented Oct 9, 2026

Copy link
Copy Markdown
Collaborator

This pull request lands step 1 of spc-2609301921521360 ("the whole spec") for itd-2609201925079472. The implement loop built it in run run-2610092052125685 as lane-1, and wrote this text from the run's records.

  • Branch build/run-2610092052125685-lane-1, from 1749094 to 92e625f.
  • Validation round 1 at 45b2057 passed: ruthless-reviewer SHIP, security-reviewer APPROVE, intent-auditor MET_WITH_CONCERNS.
  • It closes spc-2609301921521360 and ships itd-2609201925079472; the fidelity audit's verdict is on the intent's record.

Delivers: itd-2609201925079472
Assisted-by: abcd:dev
Assisted-by: Claude:claude-opus-5-5

REPPL added 2 commits October 9, 2026 22:11
A new run now asks each route its roles take for the quota it has left
before anything is written. Where a route reports one, the run's
estimate for that route's roles (about 80000 tokens an agent, the
implementer and two reviewers per step, the auditor once) is compared
with it, and a run it exceeds is refused naming both numbers. A route
that reports none, the host and every shipped runner today, is named
and its check skipped out loud in the result and the run record.

A runner that answers with a rate-limit response is no longer fallen
back on. The step frees that agent's slot, checkpoints every lane with
work in flight to its own branch in the run record, ends the window
early with next_eligible_at written once, names the lane, role and
runner, and exits 0 naming the time. The claude and opencode adapters
recognise the response; the event shapes they read are assumptions a
live check still owes.

Refs: itd-2609201925079472, spc-2609301921521360
Assisted-by: Claude:claude-opus-5-5
The implement loop's landing for itd-2609201925079472 (spc-2609301921521360, step 1): closed spc-2609301921521360 (itd-2609201925079472 planned -> shipped), audit rcp-c411be255805 ingested.

Delivers: itd-2609201925079472
Assisted-by: Claude:claude-opus-5-5
@REPPL

REPPL commented Oct 10, 2026

Copy link
Copy Markdown
Collaborator Author

Closed unmerged: while it was held for the v0.13.4 cut, main gained the security batch (#883) and the lost-connection work, which conflict with this branch in the loop's options and step result. Pacing is being rebuilt by a fresh build run on the current main, so its reviews judge the code that lands.

@REPPL REPPL closed this Oct 10, 2026
@REPPL
REPPL deleted the build/run-2610092052125685-lane-1 branch October 10, 2026 05:50
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant