Skip to content

DAOS-19616 object: retry rebuilding I/O at stable epoch boundary - #19042

Draft
wangshilong wants to merge 2 commits into
release/2.8from
shilongw/DAOS-19616-2.8
Draft

DAOS-19616 object: retry rebuilding I/O at stable epoch boundary#19042
wangshilong wants to merge 2 commits into
release/2.8from
shilongw/DAOS-19616-2.8

Conversation

@wangshilong

Copy link
Copy Markdown
Contributor

Retry updates involving rebuilding shards until their epoch is newer than the rebuild stable epoch, preventing rebuild scans from missing late writes.

Features: rebuild

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

@github-actions

Copy link
Copy Markdown

Ticket title is 'FIO crc mismatch detected on 4x node IB config while running HSN cable pulls test'
Status is 'Open'
https://daosio.atlassian.net/browse/DAOS-19616

@wangshilong
wangshilong force-pushed the shilongw/DAOS-19616-2.8 branch 2 times, most recently from 9195739 to fec6f43 Compare September 10, 2026 13:54
@daosbuild3

Copy link
Copy Markdown
Collaborator

Test stage Functional Hardware Medium Verbs Provider MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19042/3/execution/node/1713/log

@daosbuild3

Copy link
Copy Markdown
Collaborator

Test stage Functional Hardware Medium MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19042/3/execution/node/1617/log

@wangshilong
wangshilong force-pushed the shilongw/DAOS-19616-2.8 branch from fec6f43 to 90a2e20 Compare September 11, 2026 02:57
@daosbuild3

Copy link
Copy Markdown
Collaborator

Test stage Functional Hardware Large MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19042/3/execution/node/1723/log

Retry updates, punches, and CPD writes until their epoch is newer than
the rebuild stable epoch.

Features: rebuild
Signed-off-by: Wang Shilong <shilong.wang@hpe.com>
Features: rebuild
Signed-off-by: Wang Shilong <shilong.wang@hpe.com>
@wangshilong
wangshilong force-pushed the shilongw/DAOS-19616-2.8 branch from 90a2e20 to 3860b35 Compare September 11, 2026 10:35
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Development

Successfully merging this pull request may close these issues.

2 participants