DAOS-19616 object: retry rebuilding I/O at stable epoch boundary - #19042
DAOS-19616 object: retry rebuilding I/O at stable epoch boundary#19042wangshilong wants to merge 2 commits into
Conversation
|
Ticket title is 'FIO crc mismatch detected on 4x node IB config while running HSN cable pulls test' |
9195739 to
fec6f43
Compare
|
Test stage Functional Hardware Medium Verbs Provider MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19042/3/execution/node/1713/log |
|
Test stage Functional Hardware Medium MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19042/3/execution/node/1617/log |
fec6f43 to
90a2e20
Compare
|
Test stage Functional Hardware Large MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19042/3/execution/node/1723/log |
Retry updates, punches, and CPD writes until their epoch is newer than the rebuild stable epoch. Features: rebuild Signed-off-by: Wang Shilong <shilong.wang@hpe.com>
Features: rebuild Signed-off-by: Wang Shilong <shilong.wang@hpe.com>
90a2e20 to
3860b35
Compare
Retry updates involving rebuilding shards until their epoch is newer than the rebuild stable epoch, preventing rebuild scans from missing late writes.
Features: rebuild
Steps for the author:
After all prior steps are complete: