Skip to content

SRE-3829 ci: Remove EL8 support#18638

Open
osalyk wants to merge 1 commit into
release/2.8from
osalyk/SRE-3829_remove-EL8_2.8
Open

SRE-3829 ci: Remove EL8 support#18638
osalyk wants to merge 1 commit into
release/2.8from
osalyk/SRE-3829_remove-EL8_2.8

Conversation

@osalyk

@osalyk osalyk commented Jul 9, 2026

Copy link
Copy Markdown
Contributor

Signed-off-by: Oksana Salyk oksana.salyk@hpe.com

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

Signed-off-by: Oksana Salyk <oksana.salyk@hpe.com>

Priority: 2

Skip-build-leap15-gcc: true
@osalyk osalyk requested review from a team as code owners July 9, 2026 14:49
@github-actions

github-actions Bot commented Jul 9, 2026

Copy link
Copy Markdown

Errors are Unable to load ticket data
https://daosio.atlassian.net/browse/SRE-3829

@daosbuild3

Copy link
Copy Markdown
Collaborator

@grom72 grom72 added approved-to-merge PR has received release branch merge approval unclean-cherry-pick Indicates that a cherry-pick had merge conflicts that needed resolving. release-2.8 forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. labels Jul 10, 2026
@grom72

grom72 commented Jul 10, 2026

Copy link
Copy Markdown
Contributor

@daos-stack/daos-gatekeeper :
It is marked as force_landing because Functional on EL9 failure is not related to the changes made by this PR. This PR only removes EL8-related items.

@grom72 grom72 requested a review from a team July 10, 2026 08:18
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved-to-merge PR has received release branch merge approval forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. release-2.8 unclean-cherry-pick Indicates that a cherry-pick had merge conflicts that needed resolving.

Development

Successfully merging this pull request may close these issues.

5 participants