Skip to content

CAMEL-23509: document 4.14.8 camel-lucene header rename in upgrade guide#23239

Merged
oscerd merged 1 commit into
apache:mainfrom
oscerd:doc-sync/CAMEL-23509-4.14-guide
May 15, 2026
Merged

CAMEL-23509: document 4.14.8 camel-lucene header rename in upgrade guide#23239
oscerd merged 1 commit into
apache:mainfrom
oscerd:doc-sync/CAMEL-23509-4.14-guide

Conversation

@oscerd
Copy link
Copy Markdown
Contributor

@oscerd oscerd commented May 15, 2026

Summary

Doc-sync for the camel-4.14.x backport of #23208 (CAMEL-23509). The maintenance-branch backport intentionally did not touch the upgrade guide — per the project policy, the version-specific upgrade-guide files for ALL release lines live on main, so this PR adds the matching entry to camel-4x-upgrade-guide-4_14.adoc here.

The note documents the camel-lucene header-value rename that ships in 4.14.8 (QUERY -> CamelLuceneQuery, RETURN_LUCENE_DOCS -> CamelLuceneReturnLuceneDocs, plus the consequent Endpoint DSL accessor renames), under the existing == Upgrading from 4.14.3 to 4.14.8 section.

Related

Claude Code on behalf of Andrea Cosentino

Signed-off-by: Andrea Cosentino <ancosen@gmail.com>
@github-actions github-actions Bot added the docs label May 15, 2026
@github-actions
Copy link
Copy Markdown
Contributor

🌟 Thank you for your contribution to the Apache Camel project! 🌟
🤖 CI automation will test this PR automatically.

🐫 Apache Camel Committers, please review the following items:

  • First-time contributors require MANUAL approval for the GitHub Actions to run
  • You can use the command /component-test (camel-)component-name1 (camel-)component-name2.. to request a test from the test bot although they are normally detected and executed by CI.
  • You can label PRs using skip-tests and test-dependents to fine-tune the checks executed by this PR.
  • Build and test logs are available in the summary page. Only Apache Camel committers have access to the summary.

⚠️ Be careful when sharing logs. Review their contents before sharing them publicly.

@oscerd oscerd merged commit 6e618e7 into apache:main May 15, 2026
7 checks passed
@oscerd oscerd deleted the doc-sync/CAMEL-23509-4.14-guide branch May 15, 2026 09:36
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant