Repository navigation
[TS PBT] Retain confirmed DSL faults before symbolic preparation - #571
Open
CaelmBleidd wants to merge 1 commit into
Open
CaelmBleidd wants to merge 1 commit into
CaelmBleidd wants to merge 1 commit into
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
A confirmed PBT fault in DSL BOTH mode previously continued into frontend preparation and symbolic search, allowing an expired budget to replace the existing finding with an exception. Stop before symbolic preparation when concrete execution has already found a fault, retain its named check, and pass the same absolute deadline through the composed symbolic API. Expired preparation remains a structured skipped-symbolic result.
Own diff: 3 files, +49/-5, one commit. Depends on #569 at
7e6d9b9c9; its frozen assembly dependencies are documented there. After the dependency stack merges, move only this own commit onto the current main and retarget; the assembly implementation is inherited and excluded from this diff.Validation: a normal public BOTH regression with a 60-second budget confirms the original concrete check and verifies that no symbolic work starts. The existing public expired-deadline regression and real machine caller-deadline regression passed; focused DSL/native checks passed. No short wall-clock threshold is used to prove the confirmed-fault short circuit.