Skip to content

docs: reconcile delivered work and accepted fixture coverage - #516

Merged
BunsDev merged 6 commits into
mainfrom
docs-state-reconcile
Nov 12, 2026
Merged

BunsDev merged 6 commits into
mainfrom
docs-state-reconcile

Conversation

@BunsDev

@BunsDev BunsDev commented Nov 12, 2026 •

Copy link
Copy Markdown
Contributor

The living status map still described delivered local-model repairs and completed packaged credential QA as pending, and the Local Models design brief said no UI existed. This records the actual protected delivery, scoped native evidence and implemented Settings/model-menu controls, while keeping the missing native compatibility-test/qualification-result workflow and remaining privacy, runtime, device and human gates explicit. Historical failures, candidate counts, unknown causes and owner disposition are preserved.

It also records the accepted full CR-8 fixture journey: real Electron/main/IPC navigation, explicit synthetic review, current/stale findings, draft confirmation, one mocked write, crash/reconciliation and no replay. The existing hosted pass uses runtime/test inputs identical to named main; no real provider or GitHub write is inferred from the synthetic fixture. #327 is now six of seventeen, and its other criteria remain open.

It also reconciles the delivered CF-8 reproducibility criterion: protected #514 merged at signed 30a56557, and the literal acceptance receipt records #281 at ten of 27 boxes. The checklist, measurement summary and Next entry now retain the named-source reproduction and listed visual differences while keeping the fresh integrated-candidate, live-provider, human, device, child and rollout gates open. Historical measurements do not qualify later runtime changes.

Protected delivery is complete: #516 merged at signed b6e3026234cf39c51f5ad0dbb6183f3c5c5b0b83 on 2026-11-12 at 23:18:28 UTC, with parent e6e644ea and tree aed87bb64085761bc68ddffbb2e6c7d92eb8c6f8. That tree matches the qualified source 00b1134 exactly; both authored documentation files were independently compared byte-for-byte. Actual protected merge-group run 43323455378, required macOS job 131549821354, passed 2,579 units with 36 skips and zero failures/cancellations, 525 desktop E2E cases with 14 skips in 24.3 minutes, eight site cases and four web cases. No retry annotations were observed. Both protected-run artifacts have matching API SHA-256 digests and verified ZIPs. The queue iPhone job skipped; the earlier source iPhone success remains separate and is not physical-device evidence. All ten source checks, four source artifacts, exact tested preview and independent review/rulings are preserved, along with the verified full source recovery bundle. Main reconciliation retained exact protected-main and previously qualified prose, without new acceptance or policy. Broader issue, native, human and release gates remain open.

Related: #290, #376, #378, #380, #381, #327, #281. Product behavior, defaults, execution admission and release state are unchanged. Broader issue acceptance and ongoing documentation stewardship remain open.

@vercel

vercel Bot commented Nov 12, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
modex Ready Ready Preview Nov 12, 2026 9:53pm UTC
modex-app Ready Ready Preview Nov 12, 2026 9:53pm UTC

Request Review

@BunsDev BunsDev changed the title docs: reconcile delivered local-model status and qualification gaps docs: reconcile delivered work and accepted fixture coverage Nov 12, 2026
@github-code-quality

github-code-quality Bot commented Nov 12, 2026 •

Copy link
Copy Markdown

Code coverage overview

Languages: TypeScript

TypeScript / code-coverage-agent

main e6e644e docs-state-reconcile 00b1134 +/-
65% 65% 0%

ℹ️ Calculations represent line coverage. Results may change as calculations are updated.


Updated November 12, 2026 22:45 UTC

Resolve the checklist conflict by retaining main's LM tracker count and closed LM-2 disposition alongside the accepted CR-8 fixture journey. Keep all reviewed documentation repairs and main acceptance receipts intact.
Retain the reviewed owner-PR reconciliation and delivered private-IPv4 policy, with physical-device acceptance still pending. Build and full units pass after integration.
Retain protected main evidence and record the accepted named-source reproducibility criterion at ten of 27 CF-8 boxes. Preserve remaining integrated-candidate, native, human and device gates. Fresh build and full units pass after integration.
Retain the delivered native-boundary paragraph and the qualified CF-8 acceptance text when reconciling status. Fresh build and full units pass with 2579 passes and 36 explicit skips.
@BunsDev
BunsDev added this pull request to the merge queue Nov 12, 2026
Merged via the queue into main with commit b6e3026 Nov 12, 2026
11 checks passed
@BunsDev
BunsDev deleted the docs-state-reconcile branch November 12, 2026 23:18

This branch was successfully deployed

1 active deployment
Preview – modex — 00b11343 Deployed Nov 12, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant