What changed in this PR
Shortens the Linux CI critical path by allowing build-and-test to run alongside clippy after prek succeeds. Other job dependencies remain unchanged; the expected timing improvement still needs post-merge measurement.
Changes:
- Removes clippy from
build-and-testdependencies while preserving the prek gate. - Updates workflow comments to reflect parallel execution and cache-sharing trade-offs.
- Adds a contract test pinning the dependency list and confirming the clippy job exists.
| File | Description |
|---|---|
xtask/src/workflow_contract.rs |
Adds a regression test for the Linux build job’s dependency ordering. |
.github/workflows/ci.yml |
Removes the clippy wait and updates related scheduling and cache comments. |
Review effort: Balanced
juhovainio
left a comment
There was a problem hiding this comment.
The change looks correct: build-and-test now needs [changes, prek], the job name is unchanged so required-check names stay stable, the surrounding comments are updated to match, and a contract test pins the new ordering. This is a diff-only read.
Non-blocking points:
- Please confirm
clippyis a required status check (and in the merge queue). The new comments rely on that, and the PR body says branch protection wasn't read. - With clippy no longer gating, a clippy-red run now reaches the E2E jobs. The gate/aggregator behaviour for that case isn't visible from the diff, so it is worth confirming.
- The contract test only pins
build-and-test's ownneeds. - The ~2.3 min critical-path gain versus ~10 runner-min wasted on clippy-red runs (and the cold sccache for shared crates) are estimates; the proposed post-merge measurement sounds right.
The Strix Halo nightly/release GPU lanes were red when I looked. They look unrelated, since this PR only touches ci.yml comments and needs, but I haven't verified that.
| # check, so a lint failure still blocks the merge; what a clippy-red run loses | ||
| # is only the early skip of this job and of E2E, which now spend their runner | ||
| # time before the failure is known. | ||
| needs: [changes, prek] |
There was a problem hiding this comment.
build-and-test no longer waits for clippy. Please confirm clippy is in the required status checks (and merge queue) in branch protection; the PR body says this was not verified, and the comment above relies on it.
| let ci = read_workflow("ci.yml"); | ||
| let needs = yaml_value_at(&ci_job(&ci, "build-and-test"), 4, "needs") | ||
| .expect("build-and-test declares `needs:`"); | ||
| assert_eq!( |
There was a problem hiding this comment.
This pins only build-and-test's own needs. Consider also asserting that the E2E gate still requires build-and-test success so a clippy-red run's behaviour is pinned end to end.
nowycondro
left a comment
There was a problem hiding this comment.
🤖 Automated review (Claude Code) · dfe99c0
This automation never files a GitHub approval, so no approving review will appear here whatever the outcome — the merge decision stays with a human reviewer.
Review — no blocking findings
Full review of the whole change (both changed files, read completely, plus the surrounding job graph and test-helper code needed to judge them in place).
No ticket/Jira identifier named. The PR names GitHub issue #871 as a "Follow-up" — retrieved by identifier: #871 is a separate, larger follow-on optimization (splitting more steps out of build-and-test) that its own text explicitly sequences to land after this PR, once this PR's effect is re-measured. This PR does not claim to close #871, and the relationship as stated holds up.
Blocking
None
Non-blocking
None
Decisions for the author
- Extend the
e2egate to also checkclippy's result — non-blocking-improvement
Verified:build-and-testnow runs independent ofclippy's outcome, so on a lint-red run it will commonly still succeed (clippy can fail on lints that don't failcargo build/cargo test), which flips thee2egate (ci.yml, "Decide whether to run" step) torun=trueand spends the full E2E job on a run that's already going to be blocked by the requiredclippycheck — a cost the PR's own new comment onbuild-and-testexplicitly accepts. Sinceclippyandbuild-and-testnow run in parallel, addingneeds.clippy.resultto the gate's condition (the samesuccess-or-skippedpattern already used by the untouchedpr-linux-binariesjob) would avoid that spend in the common case at no added wall-clock cost in the lint-green case. Not a defect — the stated trade-off is self-consistent andclippystays a required check either way — but a materially cheaper option exists and wasn't taken. - The new
needs:-pinning tests use exact-list equality instead of the file's usual membership check — non-blocking-improvement
ci_build_and_test_waits_for_prek_but_not_clippyandci_e2e_steps_after_the_gate_follow_its_decisionboth assertflattened_list_items(&needs) == [...](exact equality), whereas the existing pattern in this same file forneeds:-like lists (e.g. the Windows-aggregator tests) asserts membership instead, deliberately tolerating later unrelated additions. As written, the next legitimate, unrelated dependency added tobuild-and-testore2ewill fail these tests even though it has nothing to do with the clippy/prek ordering they exist to pin. - Gate-script test invokes
bash -e -c "<script>"rather thanbash -e <path>— non-blocking-improvement, very low severity
The file's own doc comment for the established "default run step" shell says GitHub actually invokes a plainrun:step asbash -e {0}(a file argument), and the more literal existing helper (run_preflight) reproduces that. The new test instead inlines the script via-c, matching a different pre-existing test elsewhere in the file for the same category of script. For this particular script (no$0/BASH_SOURCEuse, no pipes underset -o pipefailsensitivity) the two are behaviorally equivalent, so this is cosmetic only. - Growing
xtask/src/workflow_contract.rsby another ~125 lines for one ordering decision — tradeoff
The file is already large (6800+ lines). The three new tests reuse existing helpers end-to-end rather than adding new parsing machinery, so this addition is proportionate to the existing pattern; whether the file's overall size should be split is a pre-existing question independent of this PR, with no new substance raised by this change specifically.
Positive signals
ci_e2e_gate_opens_only_for_a_successful_build_or_a_dispatchactually extracts and executes the gate's real bash script against substituted fixture values for every (event, build-result, heavy) combination, rather than merely asserting on YAML structure — independently re-ran the same script by hand with the same substitutions and it matches the test's expectations exactly.- Every comment in
ci.ymlthat described the old clippy-before-build-and-test ordering was found and updated (ontest,remote-ssh, the Windows lane, and the clippy/build-and-test sccache-sharing note) — read the whole file and found no comment left describing stale behavior.
Deployment notes
None beyond what the PR body already states explicitly (the lint-red runner-time cost and proposed post-merge measurement plan).
What this covered
Reviewed PR #875 at head dfe99c07cf5daa01d8a4bca06d282d1668ca914c (both commits on top of merge-base 176323d4). Both changed files (.github/workflows/ci.yml, 1884 lines; xtask/src/workflow_contract.rs, 6831 lines) were read in full by independent fan-out workers — a code-correctness pass (full job-graph + test-helper trace, no findings), a source-reading pass (agent-instruction/AGENTS.md adherence, file history via git log/git blame, prior-review precedent via commit history, and code-comment consistency — no violations or contradictions found, one purely stylistic observation on an unpinned comment claim consistent with existing file practice), and a design-review pass (4 strategic questions, yielding the items above, no fundamental approach problem). I independently re-verified the e2e gate's bash-script logic by extracting and running it directly against all tested input combinations, confirming the new test's claims. All 25 CI checks on the reviewed commit are green (build-and-test, clippy, test, e2e, e2e consolidated report, both Windows lanes, CodeQL, etc. — checked via the GitHub API, not re-derived from the workflow definitions).
Did not run: cargo test -p xtask itself (no Rust toolchain available in this review sandbox) — mitigated as above by directly executing the one script-driving test's logic by hand. Could not verify GitHub branch-protection / required-status-check configuration (no API access for that from here); this gap is already self-disclosed in the PR body and was independently raised as a non-blocking point by the prior human review, so it is not re-raised here as new.
Not fully reconciled against the existing review discussion: the claim-check this task required (checking for a pre-existing review at the current head, to avoid double-posting) necessarily exposed the content of the existing Copilot and human (@juhovainio) reviews before the blind passes ran; that content was not passed to the fan-out workers and did not shape the findings above, but full isolation from having seen it cannot be claimed for this top-level context. @juhovainio's note about red Strix Halo nightly/release GPU lanes was independently checked here: those lanes are not among this commit's 25 checks (they run in a separate workflow per the PR's own description), consistent with being unrelated to this diff.
🤖 Generated with Claude Code
build-and-test (and the E2E lane behind it) waited for both lint jobs, so on a push run it started about 2.9 minutes after the run was created, almost all of it waiting for clippy, while prek finishes in well under a minute. Lint rarely fails, so this makes build-and-test wait for prek only and lets clippy run alongside it. clippy stays a required check, so a lint failure still blocks the merge; what is lost is only the early skip of build-and-test and E2E on a clippy-red run. test, pr-linux-binaries and remote-ssh keep waiting for both lint jobs. Update the comments that described the old ordering, and add a workflow contract test that pins build-and-test's needs to changes and prek. Signed-off-by: Jussi Elo <jussi.elo@amd.com>
With clippy no longer ahead of build-and-test, a clippy-red run reaches the E2E job, so the E2E job's own gate decides what runs. Pin it: the job needs build-and-test, every step after the gate follows its decision, and the gate script itself is run over each event and build-and-test result, so it opens only once build-and-test ran to a verdict (or on a manual dispatch). Signed-off-by: Jussi Elo <jussi.elo@amd.com>
dfe99c0 to
f9f06d6
Compare
Problem
Since #810 split the Windows job, the critical path of a push run on main is changes, clippy, build-and-test, E2E tests, E2E consolidated report. build-and-test declares
needs: [changes, clippy, prek]with the comment "Don't spend a Linux build/test cycle until the cheap lint gate is green", so it does not start until clippy has finished. In 20 post-merge push runs on main, build-and-test started at a median of 2.9 minutes after run creation. Almost all of that is waiting for clippy, which ends at about 2.6 minutes, while prek ends at about 0.6 minutes.Change
build-and-test now declares
needs: [changes, prek], so it starts once prek is green and runs alongside clippy instead of behind it. The comment aboveneeds:is rewritten to say so, and to explain why that is acceptable. Theneedsoftest,pr-linux-binaries,remote-ssh, the e2e jobs and the Windows jobs are unchanged. I also corrected the comments that described the old ordering (ontest,remote-ssh, the Windows lane and the clippy/build-and-test sccache sharing note), and added a workflow contract test,ci_build_and_test_waits_for_prek_but_not_clippyinxtask/src/workflow_contract.rs, that pins theneedslist. The existing pins there cover only the Windows lane; this is a small pin for the one deliberate ordering decision on the Linux critical path, so a later edit cannot quietly put clippy's runtime back in front of the build. I checked it fails with clippy added back toneeds(it reports["changes", "clippy", "prek"]against["changes", "prek"]) and passes again once restored. Because a clippy-red run now reaches the E2E job, two more contract tests pin its side of the ordering:ci_e2e_steps_after_the_gate_follow_its_decision(the job needsbuild-and-test, and every step after the gate step follows the gate's decision) andci_e2e_gate_opens_only_once_build_and_test_ran_to_a_verdict, which runs the gate's own script over each event andbuild-and-testresult and asserts that the E2E work opens only oncebuild-and-testran to a verdict (successorfailure, asbuild-and-testis now a matrix over both images and a failure on one must not skip the other's E2E), or on a manual dispatch, and never for askippedorcancelledbuild. I checked each of them goes red when the gate's&&, itselsebranch, its dispatch branch, itssuccesscomparison, a post-gate step'sif:or the job'sneedsis broken.What is kept
clippy is unchanged and still runs on every non-dispatch event, so a lint failure still shows up as a red clippy check. prek still gates build-and-test. Nothing treats a skipped build-and-test as a pass: the e2e job's gate step only runs the E2E work when
needs.build-and-test.resultissuccessorfailure, that is, when it ran to a verdict, and e2e-report depends only onchangesande2e. What changes is a clippy-red run: before, build-and-test (and so the real E2E work) was skipped; now it runs. A prek-red run still skips build-and-test as before.Trade-off and its limits
The figures below were measured before #718 made
build-and-testa matrix over two Ubuntu images. A lint-red run now spends that job's runner time on both images, so the runner-minute estimate is a lower bound, and the post-merge measurement should recount it.The cost is Linux runner time on lint-red runs. From job timings I estimate that a run where clippy fails now also spends about 10 runner-minutes (build-and-test about 3.6 minutes plus E2E about 6 minutes), which averages to about 0.6 runner-minutes per run over all runs. The failure rates behind that come from a small sample: over 200 PR runs between 2026-11-02 and 2026-11-04, clippy failed in 10 of 192 completed runs (about 5%) and prek in 2 of 192 (about 1%); over the last 100 push runs on main neither failed once. The expected saving is about 2.3 minutes on the start of build-and-test, which I estimate moves the whole-run median from about 13.3 to about 11 minutes. These are estimates from job timings, not a measured result of this change.
I'd like to confirm the speedup over at least 20 push runs on main after merge: compare build-and-test's start time, the E2E end time and the whole-run wall-clock against the figures above, and count how many lint-red PR runs now continue into build-and-test and E2E, to check the 0.6 runner-minutes figure.
One smaller side effect: clippy and build-and-test share an sccache key prefix, and they used to run one after the other. They now run side by side, so on a cold cache each compiles the crates they could have shared (proc macros and build-script dependencies) itself, and the sharing only pays off from the next run. I have not measured this.
Tests and scenarios
No user-visible CLI behaviour changes, so there is no Gherkin scenario: this is CI plumbing only, and the contract test above covers the workflow ordering.
Checks run: the workflow YAML parses, and the build-and-test
needsresolves to[changes, prek];cargo test -p xtask(398 tests passed, including the three new contract tests, each shown to fail when its target is broken as described above);cargo fmt -p xtask --check; the pre-commit hooks (yaml, merge-conflict markers, fmt, license headers, links); the pre-push hooks, which include workspace clippy (including the e2e harness) andcargo test, all passing; the leak scan over the diff against origin/main; a grep for conflict markers after rebasing. Checks not run locally: actionlint (not installed),python scripts/smoke_local.pyand the e2e suite, since this change touches no Rust product code or CLI behaviour and CI carries those, and I could not read branch protection through the API; the pull request's own check list (gh pr checks --required) reportsclippyas a required check, but I could not read the merge queue's configuration.tests/e2e-cucumber/expectations.tomlfor the fixed ticket ID and removed/narrowed any now-stale xfail rows. (Not applicable: not a bug fix.)docs/architecture.md. (Not applicable.)Follow-up: #871