Skip to content

Tavasyag/ephermeral gen#17994

Draft
tavasyag wants to merge 5 commits into
GoogleCloudPlatform:mainfrom
tavasyag:tavasyag/ephermeral_gen
Draft

Tavasyag/ephermeral gen#17994
tavasyag wants to merge 5 commits into
GoogleCloudPlatform:mainfrom
tavasyag:tavasyag/ephermeral_gen

Conversation

@tavasyag

Copy link
Copy Markdown
Contributor

Release Note Template for Downstream PRs (will be copied)

See Write release notes for guidance.


@modular-magician

modular-magician commented Jun 17, 2026

Copy link
Copy Markdown
Collaborator

Hi there, I'm the Modular magician. I've detected the following information about your changes for commit 5607ef8:

Diff report

Your PR generated the following diffs in downstream repositories:

Repository Diff Link Changes
google provider View Diff 5 files changed, 326 insertions(+)
google-beta provider View Diff 5 files changed, 326 insertions(+)

Errors

google provider:

  • The diff processor failed to build. This is usually due to the downstream provider failing to compile.

google-beta provider:

  • The diff processor failed to build. This is usually due to the downstream provider failing to compile.

Test report

Important

Manual Verification Required

VCR cannot automatically execute the following tests added in this PR. Please verify them manually:

🔴 TestAccEphemeralKMSKeyRing_basic

Analytics

Total Tests Passed Skipped Affected
0 0 0 0
Affected Service Packages
  • All service packages are affected

Learn how VCR tests work


Step 1: Replaying Mode

Caution

🔴 Errors occurred during REPLAYING mode. Please check the build log for details.

View the replaying VCR build log

@tavasyag VCR tests complete for 5607ef8!

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants