Skip to content

Comm Tests

Comm Tests #666

Triggered via schedule December 18, 2025 08:11
Status Failure
Total duration 2m 16s
Artifacts

python-tests.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
build (ubuntu-latest, 3.8)
Process completed with exit code 1.
Test Lint
Process completed with exit code 1.
build (macos-latest, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 25.0.1 [notice] To update, run: python3.8 -m pip install --upgrade pip
build (windows-latest, 3.8)
Process completed with exit code 1.
check
Process completed with exit code 1.
build (windows-latest, 3.8)
Back off 18.427 seconds before retry.
build (windows-latest, 3.8)
Failed to download action 'https://api.github.com/repos/jupyterlab/maintainer-tools/zipball/d734fad2dc3aadbe56a5fd530037656e770e1a8d'. Error: A connection attempt failed because the connected party did not properly respond after a period of time, or established connection failed because connected host has failed to respond. (api.github.com:443)