[ci-scan-feedback] Fix push to existing feedback PR on scheduled runs #7620
+23
−19
Build Analysis / Build Analysis
succeeded
Jun 9, 2026 in 8m 33s
.NET Result Analysis
Details
‼️ Build Analysis Check Result has been manually overridden
- The build analysis check result has been updated by the user for the following reason: build analysis is taking too long (>1h)
- The check result has changed from Pending to Success
This build has Azure Pipelines builds configured for checks. As those build complete,
build analysis for them will appear in this check within a few minutes.
Where can I learn more? Read the documentation for the build analysis here:
Build Analysis Introduction
Loading