Skip to content

Merge pull request #2 from sebin1213/main #4

Merge pull request #2 from sebin1213/main

Merge pull request #2 from sebin1213/main #4

Triggered via push April 9, 2025 19:19
Status Failure
Total duration 6h 0m 26s
Artifacts

main-checks.yml

on: push
Matrix: checks / test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
checks / format
Process completed with exit code 1.
checks / test (3.13)
The job running on runner GitHub Actions 24 has exceeded the maximum execution time of 360 minutes.
checks / test (3.13)
The operation was canceled.
checks / test (3.12)
The job running on runner GitHub Actions 29 has exceeded the maximum execution time of 360 minutes.
checks / test (3.12)
The operation was canceled.
checks / test (3.11)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
checks / test (3.11)
The operation was canceled.
checks / test (3.10)
The job running on runner GitHub Actions 39 has exceeded the maximum execution time of 360 minutes.
checks / test (3.10)
The operation was canceled.