Skip to content

chore(deps): Update actions/checkout action to v6 (#162) #332

chore(deps): Update actions/checkout action to v6 (#162)

chore(deps): Update actions/checkout action to v6 (#162) #332

Triggered via push December 1, 2025 13:26
Status Cancelled
Total duration 1m 6s
Artifacts

ci.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
clippy
Canceling since a higher priority waiting request for CI-refs/heads/main exists
clippy
The operation was canceled.
Check MSRV
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Check MSRV
The operation was canceled.
Coverage
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Coverage
The operation was canceled.
Test (windows-latest, stable)
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Test (windows-latest, stable)
The operation was canceled.
Test (ubuntu-latest, stable)
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Test (ubuntu-latest, stable)
The operation was canceled.
Test (macos-latest, stable)
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Test (macos-latest, stable)
The operation was canceled.
CI
Process completed with exit code 1.
CI
Canceling since a higher priority waiting request for CI-refs/heads/main exists