feat: enhance escalation execution #3619
ci.yml
on: pull_request
commit-lint
/
Commit Lint
13s
lint
/
Lint
24s
Matrix: test / Test
Annotations
14 errors
|
commit-lint / Commit Lint
Process completed with exit code 1.
|
|
lint / Lint
Process completed with exit code 1.
|
|
test / Test (3.12, windows-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
test / Test (3.12, windows-latest)
The operation was canceled.
|
|
test / Test (3.11, windows-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
test / Test (3.11, windows-latest)
The operation was canceled.
|
|
test / Test (3.12, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
test / Test (3.12, ubuntu-latest)
The operation was canceled.
|
|
test / Test (3.13, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
test / Test (3.13, ubuntu-latest)
The operation was canceled.
|
|
test / Test (3.13, windows-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
test / Test (3.13, windows-latest)
The operation was canceled.
|
|
test / Test (3.11, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
test / Test (3.11, ubuntu-latest)
The operation was canceled.
|