Pointer/ledger only — not a plan body. Execution detail (phase checklists, build steps, QA gates, deep notes) lives in the linked
PROJECT/**docs; keep it there. See the contract banner above.
| What was just completed | What's next |
|---|---|
Phase 0 (AGE + pgvector compatibility spike) closed and merged to main (PR #1, commit f20dc34). Phase 1 (application spine) on branch marathon/reflex-hybrid-analytics-starter-p1-2026-07-21 — CI is green and all 10 exit-gate items are verified (a genuine fresh-clone dry run caught and fixed a real README.md bug), but still unmerged pending reviewer approval. |
Get a reviewer pass (relay QA thread in flight) and merge to main, then start Phase 2. |
- No parked intake docs.
- Reflex Hybrid Analytics Starter — Build Plan — 7-phase build plan; Phase 0 complete and merged, Phase 1 (application spine) in progress and gates Phase 2 onward.
- Marathon Plan & Swarm Analysis — execution plan for running PROJECT.md's phase chain via
marathon.sh. Phase 0 was fired through it and escalated (turn-timeout-or-hang, seephases/reflex-hybrid-analytics-starter--p0/ESCALATION.md); not re-fired since.
- No completed docs.
- No deferred docs.
Add new work here only when a real PROJECT/** doc exists to own the execution detail.